Tiling Services in Dubai
Re-tiling a shower wall, replacing cracked tiles or re-grouting a whole bathroom, including mould treatment. Every job below is booked as a callout and quoted in writing once we've seen the tiles.
What we do
Booking reserves the callout fee only. The price for the work itself is quoted in writing after the technician has seen the job, and nothing goes ahead until you approve it.
Smaller tiling repairs we cover
- Cracked or chipped tile
- Loose or hollow-sounding tile
- Missing tile that needs replacing
- Grout cracked, stained or coming away
- Re-grouting needed
- Silicone around tile edges or corners cracked or mouldy
- Tile sealing or waterproofing touch-up
- Uneven or lifting floor tiles
- Water coming through tiled floor or wall
- Something else with the tiling
Terms explained
- Regrouting
- The failed grout between tiles is removed and replaced. The tiles stay where they are. Cosmetic and waterproofing work.
- Re-tiling
- Tiles are lifted and replaced. Needed when tiles are loose, cracked or drummy rather than just discoloured.
- Silicone renewal
- The flexible seal at corners, edges and around trays and baths is cut out and renewed. Different from grout, and the usual cause of leaks at joints.
How booking works
Step 1
Tell us what's happening
Book online, on WhatsApp or by phone, and pick the arrival window that suits you.
Step 2
See the price before we start
You only reserve the callout fee when you book. The work is quoted in writing after we've seen it.
Step 3
Done, signed off and logged
We finish, tidy up and send a written visit report with before-and-after photos.

